Back in the HEAT for Windows days the only SDLCs methodologies that were on the HEAT radar and considered "the norm" were Waterfall and Iterative, and there was little to no discussion about SDLC. In 2001 Agile entered the stage Lean followed soon thereafter in 2003, and in 2008 DevOps entered the stage.


